· Heating Project of Ali Complete Middle School in Tibet
The heating area of Tibet Ali Complete Middle School is 42,392 square meters. It is equipped with 36 pcs of 40-horsepower BANDON ultra-low temperature high-power commercial inverter heat pumps and radiators at the end, breaking through the regional limitations of low temperature in the plateau and providing teachers and students with a warm and comfortable campus environment.
· Hot Water Project of the Middle School Affiliated to Tibet University for Nationalities
Hot water project of the Affiliated Middle School of Tibet University for Nationalities. The school has built new washrooms in the student dormitory building, which requires a hot water supply system and renovation of the bathroom. It is equipped with 2 pcs of BANDON 30-horsepower commercial full DC inverter ultra-low temperature heat pump water heaters and a 30-ton water tank.
· Guizhou Hualin School Hot Water Project
Hualin School in Guiyang City, Guizhou Province has built two new student dormitory buildings and installed 12 pcs of BANDON 12-horsepower ultra-low temperature inverter heat pump water heaters, which can supply 120 tons of hot water per day and use an integrated water storage hot water system for heating.
· Jiangxi University of Science and Technology New Campus BOT Hot Water Project
Equipment selection: 36 pcs of BANDON 12HP ultra-low temperature commercial inverter heat pump water heaters
Equipment terminal: 360-ton water tank
Operation time: 3 years
Transformation background:
The hot water project of the new campus of Jiangxi University of Science and Technology is a BOT hot water project. After the establishment of the new campus, the school needs to configure hot water supply. After comprehensive evaluation of multiple design schemes, the school finally chose BANDON air source heat pump to provide living hot water for teachers and students. The project is equipped with 36 pcs of BANDON 12HP ultra-low temperature commercial inverter heat pump water heaters to achieve intelligent management and operation, effectively reduce energy consumption, and save operating costs.
One of the difficulties of the school hot water project is that the teachers and students have the same work and rest time, and the hot water supply time is relatively concentrated. It is necessary to solve the problem of insufficient hot water supply during peak hours and meet the normal water needs of teachers and students.
BANDON implements three operation modes for the school: energy-saving mode/automatic mode/strong heating mode. In the strong heating mode, high-frequency rapid heating is used, and in the energy-saving mode, low-frequency energy-saving and heat preservation is used. The comprehensive use meets the peak and valley water demand. It has been put into use since 2022 and has been running stably, realizing efficient constant temperature hot water supply.
· Hubei Automotive Industry College Hot Water Project
Equipment selection: 1 pcs of 12HP ultra-low temperature commercial inverter heat pump water heater
Equipment terminal: 10-ton water tank
Operation time: 2 years
Renovation background:
Hubei Automotive Industry College has fully upgraded the hot water supply system for international students' apartments, using 1 pcs of BANDON ultra-low temperature commercial inverter heat pump water heater, dedicated to providing a comfortable and convenient bathing experience for students.
The original hot water equipment of this project is affected by weather or other factors, and often has insufficient hot water supply and low heating capacity, so it cannot meet the growing bathing needs of student dormitories. After careful screening, the school finally introduced 1 pcs of BANDON advanced air source heat pump water heater equipment to provide a solution for hot water bathing in student apartments.
BANDON 12HP ultra-low temperature commercial inverter heat pump water heater can operate stably in extremely cold weather of -35℃, providing a continuous and stable hot water supply for international students. At the same time, it adopts advanced EVI technology, and low-temperature heating does not decay. It can automatically adjust the power output according to the actual water demand to achieve high efficiency and energy saving. This measure not only improves the reliability of hot water supply, but also effectively guarantees the bathing needs of each student, making a positive contribution to the school's energy conservation and emission reduction.
· Zhuzhou Rail Transit Vocational Technical School Hot Water Project
Equipment selection: 2 pcs of BANDON 12HP ultra-low temperature commercial inverter heat pump water heaters
Equipment terminal: 30-ton water tank
Operation time: 3 years
Renovation background:
The hot water project demand of Zhuzhou Rail Transit Vocational and Technical School is to meet the daily hot water needs of teachers and students. Two pcs of BANDON 12HP ultra-low temperature commercial inverter heat pump water heaters are selected as campus hot water supply equipment, providing sufficient hot water supply for teachers and students, meeting the needs of daily life and study.
The project has been running for 3 years. With its high efficiency, stability and safety, the unit has won unanimous praise from teachers and students. The water heater uses air energy as a heat source, without burning fuel, reducing environmental pollution and safety hazards. At the same time, the intelligent control system can achieve precise control of hot water supply, ensuring that teachers and students can enjoy comfortable and warm hot water at any time.