In 2020, BANDON shouldered its social responsibilities and provided a strong guarantee for the school's centralized hot water renovation, delivering a perfect central hot water solution to Guiyang Hualin School.
The two newly built student dormitories completed this year are located in the new campus of Hualin School, with a total area of 5,500 square meters and about 2,000 students living on campus. The enrollment will be expanded every year.
2. Project Background
The school's central hot water solution must first meet the basic needs of the school dormitories, which require large water consumption, frequent water use, and high water quality requirements. At the same time, Guiyang City implements a stepped charging standard for electricity prices, with the highest gradient reaching 0.11 USD/kWh, so the unit also needs to meet Safe and energy-saving usage requirements.
After a multi-dimensional comparison by the customer, they learned about the advantages of air source heat pumps in terms of safety and energy saving. They believed that BANDON has been deeply involved in the field of air source heat pumps for many years, and the technology is guaranteed. Big brands are more assured, and they finally chose BANDON full DC inverter air source heat pumps heating.
3. Regional Analysis
Guiyang is located in a subtropical monsoon climate with humidity all year round. The annual average temperature is 15.3°C, the annual extreme maximum temperature is 35.1°C, and the annual extreme minimum temperature is -7.3°C. It is hot in summer and cold in winter. According to the local climate characteristics and fully combined with the students' work and rest habits on campus, the project finally installed 12 pcs of 12HP low-temperature inverter heat pumps, supplying 120 tons of hot water per day.
4. Project Installation
Considering the large amount of hot water used in the hot water supply system of the dormitory building, the project adopts an integrated water storage hot water system for heating. The hot water supply system of the dormitory building is installed on the roof of the dormitory building, and a complete pipeline system is laid in each shower room. In terms of thermal insulation, BANDON installed an integrated thermal insulation pipe for efficient thermal insulation.
At the same time, during the installation, considering that high floors in dormitories are prone to insufficient water pressure and small water output, a pipeline booster pump was installed to solve this problem.
5. Party A’s Evaluation
It has been one month since the installation and commissioning of the unit was completed in early August 2020. Hualin School has also entered the school season, and the dormitory building is about to be put into use. We have also followed up on customer reviews as soon as possible:
① It can meet the large amount of hot water demand during peak hours;
② Noise-free operation, improving the quality of students' learning and life;
③Safe and worry-free, reducing school maintenance costs;
④ Remote monitoring via mobile phone to keep abreast of the unit's condition at any time.
The school said: After the installation and use, they have a deeper understanding of the benefits of air source heat pumps. In fact, BANDON has specialized operations in Guizhou Province, and the after-sales service is also guaranteed. After initial use, I am quite satisfied.